The 220 kV line Goma-Butembo

Written by Super User. Posted in National project

In collaboration with SNEL (DRC), the study was funded by the details - www.essaywritingplace.com ADB. For conducting a pre-feasibility study, feasibility, detailed design and develop the project tender documents, and conducting a detailed study of rural electrification of localities and development centers located along the transmission line and develop detailed patterns of distribution lines and equipment.

We have 48 guests and no members online