220kV line Ruzizi III-Kamanyola

Written by Super User. Posted in Power line projects

This line is part of the project boundary of the Ruzizi III hydropower plant. STUDIO PIETRANGELI produced feasibility studies, detailed design and preparation of tender documents and the environmental study, the Environmental and Social Management Plan (ESMP) and the Resettlement Action Plan (RAP) on the funding from the European Union. The reports of the feasibility study and detailed dailyhealthymale design are available in the month of December 2013

We have 25 guests and no members online